Urban Regeneration

Parking Re di Roma

Largo Vercelli, 9bis
Rome
Parking Re di Roma

In the heart of the Capital, a guaranteed and safe place

The King of Rome Parking, located near the homonymous square, was built by CAM Group to alleviate the burden of vehicle traffic on the Capital and allow citizens and tourists to immerse themselves in the beauty of the Appio Latino district, on the border between the San Giovanni area and the beginning of the Tuscolano district.

PLANNING
Ribichini Studio
zone
San Giovanni
Rome
Largo Vercelli, 9bis
duration of work
2013/2015
REAL ESTATE VALUE
12
MLN
hallmarks
Surface residential | square meters
N lodgings |
N social housing |
N Co-living |
Surface commercial | square meters
N venues |
Surface garages and parking spaces | square meters
N garage |
58
N parking spaces |
132
N garages and parking spaces |
Surface car parks | square meters
6000
N garage |
58
N garages and parking spaces |
N parking spaces |
132
Surface Motorcycle parking | square meters
N parking spaces |
Surface appurtenances | square meters
N appurtenances |
Surface warehouses | square meters
N warehouses |
Surface floors above ground | square meters
N classrooms |
N offices |
Surface underground floors | square meters
N parking spaces |
132
N Motorcycle parking |
Surface offices | square meters
N warehouses |
Infos
Visit the site of
Parking Re di Roma
find out more
Parking Re di Roma

A sustainable redevelopment

The intervention was developed in full respect of the conservation of the existing greenery, also focusing on new flooring systems with a retraining in a functional way for the entire area, thanks also to the inclusion of new trees, green spaces, urban furniture. A regeneration operation that has reverberated on the district, enhancing the area and homes.

Insured protection and investment in the future

constructed with the use of modern techniques, parking has a pedestrian entrance with a staircase and a convenient elevator. There is 24-hour video surveillance and a 3G network to allow the use of smartphones inside the underground car park. CAM Group also deals with the management of two floors of rotating parking spaces through the use of automated systems that guarantee low management costs. A plan is also dedicated to boxes sold to private individuals, an investment that guarantees comfort and safety in the face of weather, attempts at theft and vandalism.

A response to the need for a break

The 12 million euro project, carried out near Largo Vercelli, along an important road axis, covers 6,000 square meters and houses about 190 parking spaces and garages for three underground floors. The positioning of the car park responds to a widespread request in an area of the city particularly involved in vehicle flow and, therefore, appears to be strategic in relation to the ever-increasing need for parking and a better use and rationalization of roads.

Browse The gallery

a virtual journey to discover the project
CAM builds value
Discover the cam real estate world
Discover the cam urban regeneration world
126Martini: Residenze di luce
Contact us for more information
Register by filling out the form, a dedicated manager will contact you as soon as possible.
126martini a CAM Group initiative
The interested party declares:
*required fields